Monitoring & Controlling (1)

Çıkış

Soru 1 of 1

  Kalan Zaman


0
439275
0
600
block

Monitoring & Controlling (1)

Metni eşleştir (tıklayın ve sürükleyin)   

(0/0)




Metni Eşleştir

1

2

3

4

5

6

7

8

9

Tıkla ve sürükle

Influence the factors that cause changes

Measure performance against other metrics determined by the project manager

Measure performance against the performance measurement baseline

Determine variances and if they warrant a corrective action or change request

Take action to control the project

Perform integrated change control

Request changes

Approve or reject changes

Inform stakeholders of the results of change requests