CDS K TEST A

Exit

Question 1 of 1

  Time Left


0 [{"id":166317,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"List the following in order of required accuracy, from most to least accurate. I.\\tLocation of property lines II.\\tLocation of column center lines III.\\tDimensions of concealed concrete IV.\\tDimensions of exposed concrete V.\\tCabinet work","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":21,"explanation":"[A] Locating property lines (I) requires the greatest degree of accuracy because of legal concerns. These and column center lines (II) are always established on site before any construction occurs, and are used as references for layout of all subsequent w","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166313,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"All of the following require details which allow for movement caused by thermal changes, EXCEPT","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":17,"explanation":"[B] Wood has a low coefficient of thermal expansion. In addition, the connections in wood framing are generally flexible enough to accommodate any thermal movement that may occur. Concrete is very susceptible to cracking, especially during curing (A is in","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166316,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Which of the following tend to reduce the transmission of vibration and\/or sound? I.\\tInstalling isolators under air conditioning equipment. II.\\tIncreasing the mass of the base under air conditioning equipment. III.\\tIncreasing the cross-sectional area of air-conditioning ducts. IV.\\tLining the inside of air-conditioning ducts. V.\\tUsing a resilient suspension system for ceilings.","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":20,"explanation":"[B] All five methods tend to reduce the transmission of vibration and\/or sound. [KAPLAN CDS LESSON 2]","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166320,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"To prevent electrolysis, an architect should","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":24,"explanation":"[C] See discussion of electrolysis on pages 37 and 38. [KAPLAN CDS LESSON 2]","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166321,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Life safety codes","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":25,"explanation":"[C] Answer A is incorrect, since building and fire codes are intended to protect buildings from fire damage. In incorrect answer B, life safety codes are used in conjunction with, not instead of, building codes. Life safety codes primarily address egress ","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166323,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Select the most correct statement. Building codes","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":27,"explanation":"[D] Answer A is incorrect, since building codes are minimum, not ideal, standards. In incorrect answer B, the fire resistive requirements of building codes are intended to allow the evacuation of occupants within a specified period of time. Zoning ordinan","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166324,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Life-cycle costing includes which of the following? Check all that apply.","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":28,"explanation":"[A, B, C, and D] Life-cycle costing considers cost of the building throughout its life. Some aspects of a sustainable design may cost more initially but may result in lower life-cycle costs due to lower operating and manufacturing costs. [KAPLAN CDS LESSO","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166311,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Select the correct statement.","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":15,"explanation":"[D] The architect has the authority to reject work under subparagraph 2.6.2.5 of the AIA Owner-Architect Agreement (Document B141). Answer A is partially true, but caulking is only one part of a waterproofing system. In answer B, durability is one of seve","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166322,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Mock-ups are most appropriately specified when which of the following conditions exists? I.\\tThe project will incorporate the first installation of a new system or assembly. II.\\tThe system, assembly, or method of installation is very innovative. III.\\tThe time available for construction is short. IV.\\tThe system or assembly is to be used repetitively. V.\\tThe project has a relatively tight budget.","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":26,"explanation":"[C] Mock-ups generally do not produce time or cost savings (III and V are incorrect). For new or innovative systems (I and II), mock-ups allow testing under actual job site conditions. For repetitive systems (IV), mock-ups allow design refinements. [KAPLA","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166318,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Which of the following are created by winds acting on buildings? Check all that apply.","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":22,"explanation":"[A, B, C, and D] A moment (A) is created when wind acting on a building tends to overturn the building. Wind typically acts horizontally or laterally (B). Wind can also create uplift, especially under overhangs and above roofs (C). The massing of a buildi","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166319,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"One of the acoustical ratings given to building materials and assemblies is Sound Transmission Class (STC). This rating is concerned with","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":23,"explanation":"[B] Impact noise of a material (A) is rated by an Impact Isolation Class (IIC). Amplification and reverberation (C and D) are functions of the absorptive characteristics of a material rated by a Noise Reduction Coefficient (NRC). The correct answer, there","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166315,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Select the correct statement concerning shop drawings","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":19,"explanation":"[C] Answer A is incorrect because shop drawings are usually prepared by fabricators. The AIA General Conditions state that shop drawings do not supersede the Contract Documents (B is incorrect). D is also incorrect because the AIA General Conditions speci","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166314,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"The principal consideration in acoustic control is the sound absorptive quality of the","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":18,"explanation":"[C] See pages 41 and 42 for a discussion of acoustical control. [KAPLAN CDS LESSON 2]","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166312,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"In general, construction items may be manufactured, shop fabricated, or job fabricated. Match each item with its most common method of fabrication.","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":16,"explanation":"[A] In correct answer A, concrete may be shop fabricated (precast), but more commonly it is cast-in-place Gob fabricated). In incorrect answer B, cabinets are usually shop fabricated. Stairways are usually shop fabricated (C is incorrect). In incorrect ch","question_score_id":null,"lang":null,"questionAudioPath":null},{"id":166325,"quiz_id":"10082","answer_id":null,"answerType_id":"0","created_at":"2017-01-24 02:03:48","updated_at":"2017-01-24 02:04:45","questionName":"Which of the following is NOT a primary goal of sustainable design?","questionTimeSeconds":"0","questionTimeMinutes":"10","questionImagePath":null,"position":29,"explanation":"[B] Sustainable designs may or may not have lower initial costs. [KAPLAN CDS LESSON 3]","question_score_id":null,"lang":null,"questionAudioPath":null}]
166317
0
600
block

List the following in order of required accuracy, from most to least accurate. I.\tLocation of property lines II.\tLocation of column center lines III.\tDimensions of concealed concrete IV.\tDimensions of exposed concrete V.\tCabinet work

Select the correct answer(s).  

(0/0)












166313
0
600
none
166316
0
600
none
166320
0
600
none
166321
0
600
none
166323
0
600
none
166324
0
600
none
166311
0
600
none
166322
0
600
none
166318
0
600
none
166319
0
600
none
166315
0
600
none
166314
0
600
none
166312
0
600
none
166325
0
600
none