Week 06 : Professional Practice

Uscita

Domanda 1 of 1

  Tempo Rimasto


0 [{"id":492091,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:02:51","updated_at":"2018-06-24 19:45:30","questionName":"A type of Pre-design Service where the Architect determines the adequate size \r\nand appropriate configuration and assemblage for a proposed project in\r\nconsideration for the use, allocation and interface of spaces for given\r\nactivities. This is done mainly through primary data gathering such as\r\ninterviews, consultations, interfaces, focus group discussions(FGDs) space\r\nplanning surveys, space audits, etc. and subsequent analysis i.e. spatial\r\nlayouts with stacking concepts, especially for multi-storey structures.","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":22,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492088,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:01:37","updated_at":"2018-06-24 19:45:30","questionName":"Mr. Lover Boy Bontol wants to construct 8 residential units on a single site \r\nwith the use of one basic plan and specs. Each house is estimated to have a\r\nproject construction cost (PCC) of 1 million pesos. How much will be the\r\nMinimum Basic Fee(MBF) of the Architect for the Housing Project?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":19,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492084,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 09:59:58","updated_at":"2018-06-24 19:45:30","questionName":"An Architect who violates any of the provision of RA9266\/IRR shall be guilty \r\nof misdemeanor and charged in court by the commission a fine of not less than\r\n______ but not more than ______ P5M or imprisonment of not less than\r\n_________ to _______?.","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":15,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492089,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:02:03","updated_at":"2018-06-24 19:45:30","questionName":"Situation #1, Ar. Marcaba was commissioned to design high end housing units \r\nwith construction cost of 25.5M. A developer wanted to use a typical plan for\r\nboth two housing sites in Laguna with 18-units and Antipolo with 25-Units.\r\nWhat is the minimum basic fee of Ar. Marcaba for the said project?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":20,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492097,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:05:02","updated_at":"2018-06-24 19:45:30","questionName":" Which is not a part of Contract Documents?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":28,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492092,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:03:12","updated_at":"2018-06-24 19:45:30","questionName":" A term referring to the process by which social groups or activities which\r\nare adapted to a given environment than are its existing inhabitants or\r\nactivities enter and eventually dominates it.","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":23,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492096,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:04:41","updated_at":"2018-06-24 19:45:30","questionName":"What is SPP Document 203?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":27,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492086,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:00:52","updated_at":"2018-06-24 19:45:30","questionName":"Physical Planning, being part of the Architect-owner service agreement,\r\nshould be accomplished by the Architect first hand, as per SPP 2016 the\r\nrecommended professional fee per square meter for first 5 hectare of the plot\r\nis ____?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":17,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492094,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:03:51","updated_at":"2018-06-24 19:45:30","questionName":"In SPP Document 203, the Architect in this area of practice undertakes a \r\nscientific study on the bult environment\u2019s well-being, which allows the\r\narchitect to focus on the ways which the building\/ structure can best\r\nmaintain itself and prolong its life in a cost-efficient manner, and finally\r\nprovide recommendations to the owner\/client.","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":25,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492090,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:02:30","updated_at":"2018-06-24 19:45:30","questionName":" With regards to Situation #1, what is the percentage of the Architect\u2019s \r\ncompensation? Refer to SPP doc. 2010","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":21,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492093,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:03:30","updated_at":"2018-06-24 19:45:30","questionName":"In SPP 2010, what group does theater buildings belong?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":24,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492085,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:00:23","updated_at":"2018-06-24 19:45:30","questionName":"The jury has finally selected C. Osting + Architects to design the\r\nbowlodrome project.However, the owner wants to slightly alter the\r\nfa\u00e7ade ans apply the design of one of the shortlisted entry.It is\r\nethical and why?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":16,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492087,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:01:15","updated_at":"2018-06-24 19:45:30","questionName":"Owner-Architect Agreement","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":18,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492095,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:04:13","updated_at":"2018-06-24 19:45:30","questionName":" If the Owner continuously order changes to the design, what methods of \r\ncompensation should be used?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":26,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null},{"id":492098,"quiz_id":"25221","answer_id":null,"answerType_id":"0","created_at":"2018-06-20 10:05:25","updated_at":"2018-06-24 19:45:30","questionName":" Architect Rivera is commissioned by the town mayor of Pampanga to design and \r\nmanage the construction of 500-bed general hospital. What is the method of\r\ncompensation is most appropriate given the type of building?","questionTimeSeconds":"0","questionTimeMinutes":"1","questionImagePath":null,"position":29,"explanation":"","question_score_id":null,"lang":"","questionAudioPath":null}]
492091
0
60
block

A type of Pre-design Service where the Architect determines the adequate size and appropriate configuration and assemblage for a proposed project in consideration for the use, allocation and interface of spaces for given activities. This is done mainly through primary data gathering such as interviews, consultations, interfaces, focus group discussions(FGDs) space planning surveys, space audits, etc. and subsequent analysis i.e. spatial layouts with stacking concepts, especially for multi-storey structures.

Seleziona Le Risposte Corrette  

(0/0)












492088
0
60
none
492084
0
60
none
492089
0
60
none
492097
0
60
none
492092
0
60
none
492096
0
60
none
492086
0
60
none
492094
0
60
none
492090
0
60
none
492093
0
60
none
492085
0
60
none
492087
0
60
none
492095
0
60
none
492098
0
60
none